Construction Update: July 13, 2025

The Rebuild Bannock Street project is making great progress, and we’re excited to share the following key updates:

  • Monday, July 14: Bannock Street between 15th Street and 16th Street will close through October for utility and streetscape improvements.

  • Friday, July 25: The intersection of 15th Street and Bannock Street, along with Bannock between 14th Street and 15th Street, will reopen to traffic following major upgrades.

  • Monday, July 28: The intersection of 16th Street and Bannock Street will close through October for construction.

 

Vehicle Access:

Starting Monday, July 14, Bannock Street between 15th Street and 16th Street will be closed. The intersection of 15th Street and Bannock Street and Bannock Street between 14th Street and 15th Street will remain closed until July 25.

Pedestrian Access:
The sidewalks on the north and south sides of Bannock Street, between 14th Street and 16th Street, will be closed as well as the crossings at the 15th Street intersection. Please follow the pedestrian detours.

 

Background

Bannock Street is an important pedestrian and cyclist route that needs improvements to make it safe and accessible to all.

CCDC is improving the experience for those traveling into and out of Downtown Boise from west downtown neighborhoods by rebuilding the streetscape, adding fully signalized intersections at 15th and 16th Streets, and improving the existing bike network.

 

About the Project

Rebuild Bannock Street – 13th Street to 16th Street – improves overall safety, comfort, and accessibility by:

    • Adding traffic signals at the Bannock Street intersections at 15th Street and 16th Street.
    • Rebuilding sidewalks, pedestrian ramps, driveway approaches and adding street trees.
    • Repaving the road and updating an aging underground canal crossing below Bannock Street to ensure irrigation flow into the future.

 

Project Timeline

  • Spring 2023 – Gathering feedback and information from property owners and additional stakeholders on problems, issues, needs, and opportunities along the corridor.
  • Summer 2023 – Draft concept design developed
  • Fall 2023 – Final concept design
  • Fall 2023 – Summer 2024 – Technical Design
  • Summer/Fall 2024 – Permitting Approvals
  • January 2025 – Construction starts

 